Check a website. Research a decision. Make a focused code change. Grex runs defined tasks on computers you own and keeps the output, checks and review together.
Private early access · Current capabilities, November 2026
The assignments and output outlines below are illustrative. The linked field reports describe work actually run through Grex, including failures.
Site intelligence
Know what broke. See what changed.
For the operator responsible for several live websites.
A deployment can leave a broken link, a missing asset or a page that never becomes ready. Give Grex a defined set of public pages to inspect, then read the findings alongside what it could not check.
Example assignment · illustrative
Check the home page, pricing page and getting-started guide each morning. Report broken internal links, failed assets and page errors. Compare the findings with the last accepted report.
The next decision
Inspect the affected URL and supporting observation before deciding what to fix. A repair can become its own scoped coding mission.
On November 2, seven site reports eventually received acceptance. Scheduled dispatch had failed and required manual recovery.
The boundary
Checks cover configured public pages. They do not log in, complete purchases or prove every customer journey works.
Research briefs
Turn a question into evidence you can use.
For a founder or product lead choosing the next useful change.
Before adding another page or chasing a competitor feature, ask a narrow question. Grex gathers sources, retains what it fetched and produces a cited brief you can inspect.
Example assignment · illustrative
Compare the public guidance on our site with the questions a first-time buyer needs answered. Recommend three missing pages. Support each recommendation with sources, and separate observed facts from your interpretation.
The next decision
Read the brief and follow its evidence before choosing a next step. An accepted brief can inform a coding task; it does not authorize publication or establish demand.
Four accepted briefs identified missing pages on four sites. Across that day’s 17 research missions, five were accepted and twelve failed.
The boundary
Source checks establish traceability, not universal truth. A brief can fail its checks or review, and incomplete or undated evidence remains a limitation.
Inside the product
The result is only part of the record.
Open the work in the dashboard to inspect its artifacts, checks and review. The record keeps the evidence behind the outcome available for your next decision.
An October 27, 2026 research brief, captured November 3. Vendor statements and prices are historical source claims. Private identifiers redacted.
Repository missions
Move a small change through build and review.
For a technical team with a clear change and a repository it controls.
A missing guide, a routing bug or a focused implementation task can have a clear finish line. Specify the files a builder may change and the checks the result must pass.
Example assignment · illustrative
Add a getting-started page using the approved brief and the existing site components. Limit changes to the page and its route. Check that the route loads, the links resolve and the production build passes.
The next decision
Inspect the patch, checks and review. An accepted submission is ready for a separate decision to land the change, merge it and deploy it.
Nine of 18 missions were accepted and later merged and deployed by the operator. Eight failed and one was cancelled.
The boundary
Review acceptance is not deployment. A narrow task and appropriate checks still matter; rejected changes are not a finished deliverable.
Video missions
Give a published story another format.
For an operator turning an existing Grex field report into a short video.
A written result can also become a narrated, captioned video. The current workflow starts with a prepared storyboard and source article, then renders on a worker with the required video tools.
Example assignment · illustrative
Render the prepared storyboard for a published Grex field report. Use only the approved public pages for footage. Include narration and captions, and retain the video checks with the result.
The next decision
Watch the result and assess whether it faithfully represents the source. Operator acceptance and public distribution remain separate decisions.
The October 29 report records accepted storyboard work and renderer components. It does not establish automatic video production or a published campaign.
The boundary
This is a constrained public-site workflow with prepared inputs. It requires a configured rendering worker and does not automatically publish to social platforms.
Recurring work
Give tomorrow’s work a place to live.
A daily site check needs a schedule. A standing responsibility needs a way to review evidence and choose what happens next. Grex keeps both in the product.
↻
Repeat a defined task
Save a mission template and run it daily. Inspect each scheduled run, pause it, and see when dispatch or execution fails. Repeated failures can stop the schedule.
Example: inspect the same public pages every morning and review the latest report.
◎
Keep a responsibility in view
An office records an ongoing responsibility, a metric, a review cadence and permitted scope. Its reviews connect evidence, follow-up proposals and operator decisions.
Example: review open site faults, propose the next repair and record whether the chosen measure improved.
Actual Grex schedules, recorded November 3, 2026. Private identifiers are redacted; recorded enabled, paused and stopped states are preserved.
AutomationBench is where we are testing simulated business tasks. That work is experimental; it is not a live customer email or CRM integration. The first pilot did not show a quality improvement over its direct runner.
Analytics is optional. Google Analytics loads only if you accept. You can change your choice in Analytics settings in the footer. See our privacy policy.